IIW

Cox Springs Pumping Facility

Peosta, IA

Cox Springs Pumping Facility

The City of Peosta is currently constructing a new water pumping facility along Cox Springs Road.

The project is in the final phase of a larger project that connects the City of Peosta’s water distribution system from the corporate limits on the east edge of the City, to a large development approximately 1.5 miles away. The pump station will supply additional pressure and serve as a secondary source of water for the development, including potential future connections to surrounding developments.

The project consists of a new building that will house booster pumps and hydropneumatic pressure tanks, process piping, future chemical addition capabilities, a restroom, a parking bay, and a standby generator.

IIW is providing architectural, structural, and municipal design, as well as land survey and inspection services.

projects:

Water