IIW

Bidding

Bidding

Water Treatment Improvements 2018

Bellevue, Iowa, Municipal Utilities

Engineer Estimate$1.9M
Date of Bid3/6/2018
Time of Bid1:00 p.m.
Deposit Amt$0.00
Refund Amt$0.00
Date Plans Available2/9/2018
IIW ContactChris Becklin
Number of Addenda
Project No:16101 - 01
Description of Project
PLANS AND SPECIFICATIONS ARE AVAILABLE FROM: TRI-STATE BLUEPRINT, 696 CENTRAL AVENUE, DUBUQUE, IA 52001 PHONE: 563-556-3030. FOR ELECTRONIC COPIES CONTACT: r.walter@iiwengr.com. The extent of the work involved in the Water Treatment Facility 2018 project consists of the construction of a new water treatment facility for radium removal of raw drinking water. The facility includes the construction of a 2,700 SF masonry building. The building foundation will include driven piles. The radium removal process includes vertical pressure filters, booster pumps, process piping, chemical injection equipment, and other various appurtenances. Site work includes the construction of a 20,000 gallon underground storage tank, earthwork, and other various pavement and site preparations. Also included is the installation of 2,000 LF of directionally drilled water main and 300 LF of trench installed water main, hydrants, and other various water main appurtenances. The proposed building includes a standby generator. The project also includes minor modifications to the existing Well #3 and Well #4 waterworks buildings.